Today at work we went on a tour of a sewer tunnel. It will help deal with capacity issues within two basins. It will be six miles long when completed. We got to check out the tunnel boring machine as well. It was the highlight of the trip. The tunnel is huge, about 27 ft in diameter!
No comments:
Post a Comment